Usually the below components make the whole production line For Flat Ceiling T Bar:
A(2 Uncoilers for GI& PPGI) + B(Main Machine Roll Former) + C(Automatic Punching& Cutting-off System) + D(Electric PLC control Cabinet) + E(2 Hydraulic standions) + F(Run-out Table)
For FUT and Stereo Ceiling T bar:
A(1 Uncoiler) + B(Main Machine Roll Former) + C(Punching machenism) + D(Electric PLC control Cabinet) + E(2 Hydraulic standions) + F(Cutting System) + G(Run-out Table)
HAVE ANY OTHER QUSTION?
Our machinery and production line had been exported to Europe, Middle East, Africa, South Asia, North America, South America, etc. and win good reputation all around the world.